Engine Parts Cleaned, New Crank on Order

Tonight I cleaned out all of the engine parts and got the replacement parts on order. It will be a week or two before the engine parts arrive, but I have plenty of other things to work on. I may actually take this as an opportunity to paint the engine compartment while the engine is out, so I don’t have to do this again later. The engine is about 250lbs and I can (barely) dead-lift this a few inches from the jack to the table. Doing this is no fun though, so I avoid taking the engine out as much as possible despite how easy it is electrically/mechanically (disconnect 4 bolts, a cable, a hose, and 3 wires, that’s it).

This entry was posted in Bus and tagged , . Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *