Prepping the outer 11″ of cargo floor for replacement. Welded the gutter section and started patching holes around the ‘Samba’ windows. (lots of fine-tuning left with these welds)
Prepping the outer 11″ of cargo floor for replacement. Welded the gutter section and started patching holes around the ‘Samba’ windows. (lots of fine-tuning left with these welds)