Tonight I finished installing the accelerator linkage. With this in place it allowed for the bus to move under its own power for the first time; I drove it up and down the driveway many times without any real issues. This will allow me to move it in and out of the garage to work on the remaining bodywork in the driveway; saving lots of clean-up time.
Archives
Tags
3D Printing
Animals
Aviation
Brakes
Bus
CNC
Concrete
Design
Detailing
DIY
Electrical
Electronics
Energy
Engine
Exterior
Fabrication
Golf
Hacks
Home Automation
House
Hydraulics
Interior
Jet Engine
Jetta
Lathe
Mechanical
Metalwork
Mower
Paint
Piano
Retro Computing
Rigging
Roadtrip
Science
Suspension
Transmission
Wedding
Woodwork
Yard