The 8 large Phillips head bolts holding on the cargo doors were removed after much heating, hammering, and some cutting. The cargo doors were removed and a patch was created/installed for the floor of the spare tire well. All window frames were then sandblasted and nearly all paint stripped from the inside/outside of everything above the trim line.