All 21 windows and the sunroof were masked in preparation for exterior paint. The masking will keep the recently painted interior clean while the exterior is painted. The wheels were taken off to get the roof even lower to allow working on the roof without a ladder. The next phase is to complete the bodywork on the roof in order to paint all white above the trim line. After this is completed the white areas will be masked off and the bus raised as high as practical to work on the blue areas.
Archives
Tags
3D Printing
Animals
Aviation
Brakes
Bus
CNC
Concrete
Design
Detailing
DIY
Electrical
Electronics
Energy
Engine
Exterior
Fabrication
Golf
Hacks
Home Automation
House
Hydraulics
Interior
Jet Engine
Jetta
Lathe
Mechanical
Metalwork
Mower
Paint
Piano
Retro Computing
Rigging
Roadtrip
Science
Suspension
Transmission
Wedding
Woodwork
Yard





