The cargo rocker panel, jack point, and the rear floor are welded on.

Also the loooong weld on the cargo floor repair section is completed and mostly ground down. This weld turned out very well, it should look seamless once the primer is on. Some patching of the passenger side ‘B’ and ‘C’ pillars remains, but after that I should be able to move on to the front.

This entry was posted in Bus and tagged , . Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *