Various fixes around roof exterior

The current plan is to work from the top down fixing the rot and be ready for epoxy primer by springtime. Then all summer and probably most of fall will be used to smooth the bodywork with filler, high-build primer, and lots of sanding; and have the top color coats on before it gets too cold.

This entry was posted in Bus and tagged , . Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *