Repair of the driver side interior door gutter

       Leave a comment

Various fixes around roof exterior

The current plan is to work from the top down fixing the rot and be ready for epoxy primer by springtime. Then all summer and probably most of fall will be used to smooth the bodywork with filler, high-build primer, and lots of sanding; and have the top color coats on before it gets too cold.

       Leave a comment

Patching of passenger side roof continued around to the side

       Leave a comment

Roof patching continued…

…this time on the more heavily damaged passenger’s side, custom patch panel needed.

       Leave a comment

[name of part behind engine and below engine compartment door] repaired

Splash pan will need either replacement or lots of work.

       Leave a comment

The passenger side gutter…

…is getting close to completion (this was 100% gone before). Christina cleaned up the rear bumper.

       Leave a comment

Grinding of the nose finished

This is far from flat, but close enough to make a good repair during the bodywork phase.

       Leave a comment

A second pass at joining the nose repair section to the rest of the nose

       Leave a comment

Inner and outer valances now attached

Joining of the nose repair panel to the nose begins.

       Leave a comment

Inner valance removed

(this took forever) and a test-fit of the new inner valance.

       Leave a comment